Greyline Instruments grounding rings may be required whenever meters are installed in non-metallic or lined pipes. Grounding rings placed before and after the meter eliminate electrical noise that will interfere with the proper operation of the meter. For proper operation, grounding rings are required before and after the meter.
We're open Mo-Th 8am to 5:30pm. Fr 8am to 5pm ET